Enerzone Solution 2.3 Specifiche Pagina 40

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 45
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 39
39
4.7 SECONDARY AIR TUBE REPLACEMENT
(see Figure 4.11)
1. Remove cotter pin at RH end of tube.
2. Slide tube to left and lower tube end below RH plenum.
3. Slide tube to right to remove.
4. Reassemble in reverse order using a new cotter pin. The cotter pin is a hammerlock style
and locks into place by hitting the head sharply with a hammer.
5. Note that any tube can be replaced without disturbing the baffle.
Important Notes:
Figure 4.11 – Secondary air tube replacement
The air tubes are identified for placement as follows:
Model Type of tube
Solution 1.6
Front 69 holes of 0.119"
Center& rear 69 holes of 0.109"
Solution 1.8
Front 41 holes of 5/32"
Center& rear 81 holes of 0.109"
Solution 2.3
Front 41 holes of 5/32"
Center& rear 81 holes 0.109"
Solution 2.9
All tubes 65 holes of 7/64"
#1
#2
Vedere la pagina 39
1 2 ... 35 36 37 38 39 40 41 42 43 44 45

Commenti su questo manuale

Nessun commento